OEM and Trade Policy
Standard commercial terms, tooling deposit schedules, and laboratory compliance frameworks governing direct factory production contracts.
2,000 pcs
custom box packaging MOQ
25 days
standard mass production cycle
100%
EN71 and CE testing compliance
Standard Commercial Framework
Custom Packaging MOQ
Tooling and Sampling
Production Lead Times
Warehousing and Dropshipping
Custom litho-laminated box packaging requires a minimum run of 2,000 units per artwork SKU. Orders under threshold incur a flat $600 print plate and die setup charge.
Functional prototypes deliver in 2 to 3 business days once CAD files lock. Custom steel injection molds require a 50% tooling deposit with first-article sign-off.
Mass manufacturing concludes within 25 days following batch sample approval. Run times compress to 15 days when raw resins and electronic IC components are pre-staged.
Finished pallet inventory can be staged directly inside our Shantou bonded warehouse facility, enabling daily container packing and automated dropship dispatch.
Laboratory Certification Standards
Every toy batch manufactured in our Chenghai plant complies strictly with international toy safety directives, including EN71 parts 1 through 3, EN62115 electrical standards, and complete CE declaration documentation. Production lots undergo inline mechanical torque checks and chemical phthalate screenings before bill of lading issuance.
Defective components caused by material voids or injection tolerance drift beyond 0.02mm are replaced at zero line charge on subsequent container loadings. Clients receive comprehensive third-party test reports, factory inspection lot logs, and customs declarations alongside their standard commercial invoices.
Execute Direct Factory Contracts
Request our standard supplier agreement, nondisclosure terms, and volume quotation schedule directly from our Shantou engineering desk.
